Sichuan 3D Rail Transit Technology Co., Ltd.

Product Center

+
  • Ⅻ型混凝土枕 (3).jpg
  • Ⅻ型混凝土枕 (2).jpg
  • Ⅻ型混凝土枕 (4).jpg

X Ⅱ type concrete sleeper

Scope of application parameters: The new Type II pillow is applied to high-speed railway lines with a speed of 200km/h.

Category:


Detail

Applicable parameters

The new Type II pillow is applied to high-speed railway lines with a speed of 200km/h.

Engineering case

The new Type II pillow produced by the company is used in the Guangzhou Nansha Port railway project